Hook-On installation guide

Made-to-measure panelling, fitted with confidence.

A visual, step-by-step guide to preparing your made-to-measure panels, setting the wall tracks and completing the final fit.

Completed customer-installed raised wall panelling in a hallway Finished customer installation in Bishop's Stortford
First, know the system

The tracks carry the panels.

Each panel has machined channels on the rear. These locate onto the wall-mounted Hook-On tracks, keeping the main wall fixing mechanical and hidden.

CAD view of the machined channels on the rear of a panel
Rear view: the routed channels receive the Hook-On rails.
Close CAD view of the Hook-On track engaging the rear panel channel
Detail: the rail hooks into the channel.
1

Level tracks

The two tracks establish the panel height, line and finished face.

2

Numbered panels

Keep every panel in the exact supplied sequence from unpacking to final fitting.

3

Connecting tongues

Adhesive may be used sparingly on the loose tongues to prevent movement; it is not the wall-fixing method.

Before you begin

Protect the panels and check the wall.

Prepare your tools, make sure the wall is sound and locate any hidden pipes or cables before drilling.

Tools and materials

  • Tape measure and pencil
  • Laser or spirit level
  • Long straight edge
  • Drill
  • Supplied 4mm drill bit
  • Supplied 6mm masonry bit
  • Supplied universal wall plugs
  • Supplied screws and driver bit
  • Suitable cutting tools
  • Supplied packers and adhesive
Phase 01

Plan and prepare

Confirm the sequence, prepare the tracks and establish the exact rail positions before touching the wall.

1Check and stage

Keep the supplied panel order

Carefully unpack the panels and arrange them in the exact numbered sequence. Confirm the full run before attaching anything to the wall.

Stand panels securely on a protected surface and keep the decorative faces safe from knocks and drilling dust.

Made-to-measure panels carefully staged together before installationReal project panels staged before fitting
2Measure the rails

Set the finished panel height

Lay one panel face down on a clean, protected surface and hook both hanging rails into the machined channels on the rear.

Position the tape measure 10mm below the bottom edge of the panel. Measure upwards to the top edge of each hanging rail and record both measurements.

These two measurements determine the positions of the two wall tracks.

Panel run and two tracks laid out while the overall arrangement is measuredMeasure both rail positions from the chosen floor datum
3Mark the panel run

Match the tracks to the panel joints

Lay the wall tracks across the rear or protected face of the panel run. Mark each panel joint and choose fixing positions that will not clash with those joints.

For a wall finishing into internal corners, leave the required track clearance at each end.

Fixing position: keep the first and last wall-track fixings 40mm in from the cut ends of the track.
Hanging rails positioned on the rear of a panel while their height is measuredTrack positions checked against the complete panel run
Phase 02

Set the wall tracks

Transfer the two levels, fix the tracks and use packers to bring them into one straight, vertical plane.

4Transfer the heights

Mark two continuous level lines

Transfer both rail measurements to one end of the wall. Use a laser or spirit level to continue each mark across the full fitting area.

For a full-room layout, establish the datum from the highest point of the floor so the panels stay aligned around the room.

Track position being checked with a tape measure across a demonstration panelAccurate setting out determines the finished panel line
5Drill and fix

Fit the tracks with the supplied kit

Drill the marked track positions with the supplied 4mm bit. Hold the tracks on the level lines and transfer those positions to the wall.

  • Drill the wall holes with the supplied 6mm masonry bit.
  • Insert the supplied universal wall plugs.
  • Use the supplied screws and driver bit to secure the tracks.
  • Lightly tighten at first so the tracks can still be adjusted.
Two black Hook-On wall tracks installed horizontally and ready for panelsBoth tracks fixed on the wall before the panels are hung
6Straighten and level

Pack out wall variation

Start with 6mm packers behind the fixing points. Use a long straight edge across the track and a spirit level vertically on its face.

Add or remove packers until both tracks are level, straight and aligned in the same plane. Only then fully tighten every fixing.

If the wall is badly bowed, the track can be allowed to follow the shape of the wall, provided the track remains level along its full length.

Phase 03

Hang, check and finish

Dry-fit the complete run first. Only start final assembly when every panel is aligned and the joints close correctly.

7Dry fit

Hang the full run without adhesive

Hang every panel on the two tracks in its numbered order. Check the overall height, alignment, corner fit and joint spacing.

Make any track or packer adjustments now. When the run is correct, remove every panel except the first.

A raised wall panel being dry-fitted onto the two horizontal wall tracksA real dry fit: panel offered to both fitted tracks
8Connect the panels

Work one joint at a time

Check that the loose connecting tongue is correctly located. Hang the next panel, bring the two edges together and fully engage the tongue without forcing the decorative faces.

Continue in sequence, checking the face and joint after every panel.

Loose green connecting tongue located between the edges of two raised panelsThe loose tongue aligns the neighbouring panel edges
9Final assembly

Use adhesive only on the tongue

Where required, apply a small, controlled bead of suitable adhesive to the face of the loose connecting tongue before bringing the next panel into place.

The Hook-On rails remain the main wall-fixing system. The adhesive only helps prevent movement at the connecting joint. Wipe away any excess immediately.

Close-up of adhesive applied sparingly to the connecting tongue between panelsSmall adhesive beads on the tongue — not on the wall
Full-room layouts

Corners, returns and door openings

Use the supplied layout and these visual details once the main track and panel sequence is understood.

Physical demonstration of two Hook-On tracks meeting at an external cornerPlan drawing for internal and external corner track positions
Corner detail

Stop, align and trim carefully

Internal corners need a track clearance; external tracks finish approximately in line with the wall corner. Trim the supplied corner material only after a complete dry fit confirms the position.

Plan drawing showing panel returns and sub-architrave around a doorwaySingle raised panel hanging on two demonstration tracks
Openings and returns

Finish exposed ends neatly

Use the additional supplied material to return the moulding profile where a panel run ends. Full-height layouts may use the supplied sub-architrave around door frames and other openings.

Confirmed setting-out measurements

Use these two dimensions.

These details have now been confirmed and are included here for a final check before drilling.

Rail height

Measure to the top

Start the tape 10mm below the panel's bottom edge and record the height to the top edge of each hanging rail.

Track fixing

40mm from each cut end

Position the first and last fixing holes 40mm in from the cut ends of the wall track. This is the screw position, separate from any corner clearance shown on the supplied layout.

Completed customer-installed raised panelling in a commercial bar

Before you drill

Unsure about a measurement or the setting out?

Send Raised Panelling a clear photo of the wall with your order details. It is always easier to confirm the setting out before the installation begins.

Ask for installation help